The “ A, B , C “ of Large and Mega Dams

 What is a Dam, large and Mega?

img

It is a big cement hall, that stop the course of the river. The word seems to be related to the Greek word taphos, meaning “grave” or “grave hill”, in reality it is a tombstone for the river.

By the International Commission of Large Dams (ICOLD), a large dam is higher than 15m while a Mega dam is over 100m. Most Mega dams worldwide are used for energy production.

Mega dams have been the center of many debates, research and studies for the last decade.

Between 1930 and 1970, the boom of Mega dams was seen to be synonymous with “economic development” and a symbol of human ability to assert control over nature. But then the truth of their negative impacts started to arise, and it become the center of many debates and arguments around costs-versus-benefits, ecological impacts, social impacts, etc.

From one side the proponents claim dams as a source of energy and as such a tool for development, from another side the opponents state that those benefits are far outweighed by disadvantages such as loss of communities livelihoods and rivers ecosystems to name just some.

The late 1980s and 1990s era, were marked by large protests, and controversial debates about mega dams. Pressure and huge campaigns from civil society, social movements and communities affected by dams to stop financing mega-dams. Same financed institutions, with the pressure and information about crimes against human rights, by mega dams financed by the world bank, funds were decrease to the world Bank Dams projects. Due to such an outcry, an independent commission under the chairmanship of Kader Asmal, the South African water minister, was created in April 1997, the “World Commission on Dams (WCD)”, to research the environmental, social and economic impacts of mega Dams globally. The WCD was composed of members of civil society, academia, private sector, professional associations and government representatives. The report findings and recommendations were launched under the patronage of Nelson Mandela in November 2000. The WCD found that while “ dams have made an important and significant contribution to human development, and benefits derived from them have been considerable… in too many cases an unacceptable and often unnecessary price has been paid to secure those benefits, especially in social and environmental terms, by people displaced, by communities downstream, by taxpayers and by the natural environment.” The study also made recommendations and provided guidelines which all dam projects should follow, including five core values and seven priorities detailed below:

Values

Equity,

Sustainability,

Efficiency,

Participatory decision-making and

Accountability.

Priorities

Gaining public acceptance,
comprehensive options assessment,

Addressing existing dams,

Sustaining Rivers and Livelihoods
Recognising entitlements and sharing benefits,
Ensuring compliance and

Sharing rivers for peace, development and security.

For a while, the understanding of the large costs of Mega dams started to become a reality, but suddenly with the climate crises, they came back with the tag of “Solution for Climate change”. But it is not a solution. It is riddled with problems and earns our tag of “false solution”.

At JA’s last year climate justice meeting “Seeding Climate justice II”, held in Maputo, JA invited Rudo Sanyanga, Africa Director of International Rivers (IR), who presented the impacts of dams on the climate, and debunked the myth that mega dams are one of the energy sources to address our climate crises. Without going into the known social and environmental impacts, the presenter began her presentation by asking “Hydro dams, do they provide CLEAN energy? NO, THEY DON’T, ITS NOT TRUE! They exacerbate climate change instead”. Dams especially tropical dams can often produce a huge amount of methane and carbon dioxide from rotting biomass in the reservoir. Then there are huge impacts of droughts and floods on the energy production, and dependency of hydroelectric on a changing climate is questionable.

Rudo spoke about the breakthrough research done in 2012, “ A Risky Climate for Southern African Hydro”, there was a lot of opposition, attacked by politicians, statements that IR ‘’was scaring people, and that was not going to happen’’. But it is real, 4 years after, we see that is happen, this year, Lake Kariba never went above 20% capacity, Lesotho Katse dam was 63%, Zambia that was 80% dependent of Hydro, due to a 2 years drought is turning into solar. This is real , Zambezi Basin countries will have a decrease in stream flow, as many studies estimate and a decrease of run-off to be between 26% to 40% by 2050. No one is trying to scare people, but it is already happen and is going to only become worse.

We recall back in 2012, when Rudo come to Maputo to present the finding of this study, we were attacked by most of the government participants at the launch meeting, to the point of becoming quite an ugly and unproductive meeting.

We raised the question again, how can Mozambique build a dam as risky as it is Mphanda Nkuwa is to the environmental and communities, seismic risk, and now adding the economic and climate change risk? Those risks exist, due to extreme climate changes, and they must be included in any evaluation and decision to build or not a dam.

But as the researcher stated on their study, that government, dam builders and decisions makers, are not taking into consideration the economic risks associated to climate change, in his wordsThere is been a neglect of climate risks in hydropower planning – in an approach that might be called either ‘wait and see’ or ‘head in the sand’ ”.

But it still amazes me how difficult is for people to understand and see mega dams for what they really are: a monstrosity that destroys lives, livelihoods and rivers ecosystem, to say some. In a way I can understand if you look into a coal power station, you see ugliness, you see smoke, pollution and a landscape that no one wants to live there if they have a choose. At the other end, a mega dam is an huge infrastructure that makes any engineers proud of it, a lake, and an enormous hall that splits water in amazing speed, and a sound that make you feel small in this world… for sure looks much better then a coal power station. But it is just that, a facade. Because it is not synonymous with development, just ask the 40-80 million people displaced by dams, how their lives and livelihoods have been destroyed. Neither is it a solution for climate change as it often emits methane (more in tropical areas), destroys forests for the reservoir. Neither it is good for the environmental as it block rivers and inundates forests and agricultural land , and deny downstream enough water for wetlands to operate accordingly. Neither they protect us, from flood if they are not build to do so, or a way to keep water during drought.

Why they do not protect us from floods…. Well, if they are build just for that, yes, but you do not need a Mega dam for that, a mega dam is either for energy production, irrigation or water supply. To produce energy, you need to keep as much water as possible, and then when a big flood comes, there is no space to keep all the water in, same for irrigation, and to protect us from floods we do not need mega dams, small dams are the ideal, and system that can divert water when is too much, same for drought.

JA released in 2009 a study about renewable energy sources for Mozambique, another study that was attacked by the government participants in such a way that the author had difficulties to do his presentation without being constantly interrupted, simply because that study showed that we do not need Mphanda Nkuwa, and there are other ways forward to have energy for everyone with less impacts. The magic potion is not that difficult, we need to start with decentralized energy systems, clean energy, solar, wind, even mini to small hydro dams, a mix of energy sources, which must be affordable by all people.

We can do, and we should think more on solutions to tackle and minimize climate change impacts, instead to follow a path that put us where we are…. In a crises, can we be more smart and take decisions that are smarter, at least we live in a era that we have many options, and we know what mistakes where made, that we can avoid them.

So why build mega dams, to destroy rivers systems, communities livelihoods, increase climate impacts adding the economic risk , is really a mega dam worthwhile? It is not a solution for the climate crises we are hurtling towards. Climate change will affect rivers flow, and worsen extreme and intense floods and droughts that will put a risk on the economic benefit, so why ????

For whom and what. That’s the million dollar question. Because is not for us the people, is not a solution for our climate crises, is not for the environment…. who is it for? And what is it for?

Some info on dams, from the article of 12 dams that change the world from: https://www.internationalrivers.org/blogs/227-3

Chixoy: the grave on the Rio Negro

Dam-affected communities have often suffered repression and human rights abuses. In 1982, more than 400 indigenous men, women and children were massacred to make way for the World Bank’s Chixoy Dam in Guatemala. In a historic breakthrough, the country’s government in 2014 signed a $154m reparations agreement with the affected communities.

Banqiao: the dam that washed away

When dams are not properly built or maintained, they can break. In the world’s biggest dam disaster, the failure of China’s Banqiao Dam killed an estimated 171,000 people in 1975. In more than 100 cases, scientists have also linked dam building to earthquakes. Strong evidence suggests that China’s Sichuan earthquake, which killed 80,000 people in 2008, may have been triggered by the Zipingpu Dam.

Yacyretá: the monument to corruption

Large dams are often pet projects of dictators. Lacking accountability leads to massive corruption and cost overruns. On average, large dams experience cost overruns of 96% and are not economic. The cost of Argentina’s Yacyretá Dam has mushroomed from $2.5bn to $15bn. A former president called Yacyretá “a monument to corruption”.

Merowe: when Chinese dam builders went global

In 2003, the Chinese government decided to fund the Merowe Dam in Sudan as its first big overseas hydropower project. The dam displaced more than 50,000 people and caused serious human rights violations. Chinese banks and companies are by now involved in some 330 dams in 74 countries, leading an unprecedented global dam building boom.

Glines Canyon: the dam that came down

Dams have serious environmental impacts, and their benefits dwindle as they age. Since the 1930s, the United States has removed more than 1,150 dams to restore river ecosystems and particularly fish habitats. In 2014, the 64 meters high Glines Canyon Dam on the Elwha River in the Pacific northwest was breached in the world’s biggest dam removal so far.

Patagonia: the dams that were never built

Recent years, solar and wind energy have seen their commercial breakthrough. These renewable energy sources are cleaner than coal or hydropower and can be built were people need electricity, even far away from the electric grid. In 2014, Chile cancelled five dams in the Patagonia region under strong public pressure and approved 700 megawatts of new solar and wind farms.

Kariba: the dam that ended poverty in Southern Africa (or did it?)

The Kariba Dam on the Zambezi was built in the 1950s to power Zambia’s copper belt, as the first large dam funded by the World Bank. Kariba was considered the symbol of a “brave new world”, in which controlling nature would bring quick economic development. Yet the 57,000 people who were displaced by the dam suffered famine and are still impoverished

climate_graphic2

References on WCD and more info:

https://en.wikipedia.org/wiki/World_Commission_on_Dams

https://energypedia.info/wiki/World_Commission_on_Dams_(WCD)_Report

http://www.unep.org/dams/documents/Default.asp?DocumentID=663

https://www.internationalrivers.org/campaigns/the-world-commission-on-dams

http://www.unep.org/dams/WCD/report/WCD_DAMS%20report.pdf

more https://www.internationalrivers.org/questions-and-answers-about-large-dams

Advertisements
Tagged , , , , , , , , ,

Under Water

Tagged , , , , , , , , , , , , , , , , , , ,

CORPORATE IMPUNITY: STRATEGIES OF STRUGGLE (PART II)

As we mentioned in last month’s article, corporate impunity – the crime that does pay off – is a complicated matter. At the moment, our chests are still filled with the breath of fresh air brought to us at the end of last month by the second session of the Permanent People’s Tribunal (PPT), where a panel of 8 jurors and almost 200 participants listened attentively to the complaints of communities and activists who suffer first hand the consequences of a system that favours and protects transnational corporations. Experts noted and reiterated what is no longer news to us: the criminal behaviour of these corporations reflects the field of impunity in which they operate. In addition to providing us with a (unpublished) report of deliberations that will help to expose the behaviour of these companies, this jury also made clear that the mobilization of peoples and the opening of spaces like this court are a fundamental part of the fight for justice.

03

About PPT, we have little more to say right now. You can find more information on the cases presented here, or read the press release of Southern Africa’s Campaign to Dismantle Corporate Power’s (of which we are part) here. This year, the visibility given to the different cases was notorious (like this article on ProSavana in the South African press), and there was also room for an update on the cases brought to the PPT last year in Swaziland. But this is not the time to slow down – after the PPT, more important moments regarding this issue are coming up.

Nowadays, there is a great legal asymmetry between, on the one hand, the endless regulations that protect and safeguard private investments (even shielding them from political decisions that may conflict with the companies’ financial expectations), and on the other, the non-existent coercive legislation which upholds human rights. Corporations rely on a wide range of international norms that act in their defence – from free trade agreements to investor-state dispute settlement mechanisms – but none that regulates their actions in the light of their impacts. Apparently, for years now we have been hoping that, by themselves, guiding principles or corporate social responsibility (voluntary, unilateral, and non-enforceable) become enough to prevent corporate human rights abuses by the corporations, but obviously, this has not happened and will not happen.04

The national laws of countries such as ours are very weak, not to mention the very limited capacity to enforce them and supervise them. That is one of the reasons why Shell remains unpunished despite the criminal spills it is responsible for in Nigeria, or why hundreds of people are being driven from their land to make way for palm plantations in Indonesia. This is why fighting for the enforcement of existing national legislation is an important step, but it can not be the only one if we really want to stop the impunity of these powerful corporations. It is necessary to think beyond. In today’s globalized world, corporations operate in different national jurisdictions, and take advantage of this to evade accountability. For us, expanding the limits of international law and demanding legal instruments that provide a path from where victims of such violations may demand justice seems to be as urgent or even more.

01

The Intergovernmental Working Group mandated to draft a binding Treaty on Transnational Corporations and Human Rights, set up by the UN Human Rights Council in 2014, will meet for the third time in October of this year, then, the concrete terms of the text to be included in the Treaty will be discussed. This initiative, which started with the governments of Ecuador and South Africa, has been gaining strength and supporters. Numerous countries, mostly in the Global South, have already expressed their support for the Treaty, as is the case of Uruguay, which sees in this instrument an opportunity to protect its public policies that are being threatened by the interests of transnational corporations. Mozambique, unfortunately, remains completely out of this discussion and didn’t even show up at the two sessions of the Working Group in the recent years.

An alliance was formed by civil society organizations from around the world to support the drafting of this law, and has actively participated in the sessions of the Working Group to ensure that it will truly represent the needs of those affected. One of the requirements of this alliance is that this treaty contains solid provisions that prohibit corporate interference in the process of formulating and implementing laws and policies. According to Friends of the Earth International (FoEI), also part of the Treaty Alliance, it must establish the criminal and civil liability of transnational corporations in order to fill existing legal gaps in international law, and should apply also to all subsidiary companies and those that form part of its supply chain. Learn more about FoEI’s contributions to the Treaty here.

06

 

When existing legislation does not address all of society’s problems and needs, new legislation must be created. It was like that with the implementation of universal suffrage, with the abolition of slavery, and in so many other historical moments. We believe that we are about to reach an important milestone in the struggle for the sovereignty of peoples and against corporate impunity, and as the poet once said, there is nothing more powerful than an idea whose time has come.

Tagged , , , , , , , , ,

Corporate Impunity: Strategies of struggle (Part I)

2016 was an important year in our continent’s struggle against corporate impunity: the first session of the Southern African Peoples Permanent Tribunal (PPT) took place in Swaziland. This Court, which was founded more than 30 years ago in Italy, is an independent body that examines situations of systemic human rights violations – especially in cases where existing legislation (both national and international) is not capable of safeguarding the rights of populations. Although it does not have the power to issue an obligatory sentence for the company (which, by the way, is very important and is one of the reasons we are working for – but let’s talk about it later on), the PPT is strategically very important: On the one hand, it allows victims to be heard and advised by a panel of experts from various areas and to establish partnerships; and on the other, it is a moment of complaint and visibility for the cases, and therefore, of exposure to infringing companies. And although in our country this criminal impunity is often seen as a synonym of cleverness and of the perpetrators degree of influence, on the international level things are not quite like that. Being labelled as a human rights violator is a matter of great concern to these corporations, and therefore it can lead to a change of attitude – not because their ethical principles and values are very important to them, but simply because a bad reputation affects the only thing that truly matters to corporations: their profits.

Ten cases from Swaziland, Zimbabwe, South Africa, Zambia and Mozambique were presented in last year’s PPT, most of them related to the extractive industry. From our country, for the serious impacts that their activities have on the communities around them and for the noncompliance with the promises they made to those communities before settling in the region (to the point that one of them actually started its mining activities without resettling those living within the concession area – as we have denounced through various channels including this one), we took to the court VALE and JINDAL. A Panel of Jurors listened attentively to the communities’ grievances and to a contextualization made by invited experts, and then released its deliberations.

This year the process is repeated: in August, seven cases from the Southern Africa region will be presented by the affected communities themselves and by the civil society organizations who work with them. This time, the general theme of the cases is Land, Food and Agriculture. In addition to cases presented by Zambia, Malawi, Tanzania, Madagascar and Mauritius – who will denounce large corporations such as Parmalat and Monsanto – this session of the PPT will also hear the denunciation of two Mozambican cases: the proposed Mphanda Nkuwa dam on the already strangled Zambezi River; and ProSavana, the Mozambican, Brazilian and Japanese governments’ triangular partnership program that aims to develop agribusiness in the Nacala Corridor. These two Mozambican cases have the same particularity: they are not yet implemented. However, and this is what made us chose these two cases for this year’s PPT (because, let’s face it, what we are not lacking in our country are examples of human rights violations by private initiatives), despite not being implemented yet, its impacts are not less significant.

In Mphanda Nkuwa, for example, local communities were visited for the first time in 2000 by representatives of the companies responsible for the construction of the dam. They ere warned that they could not build new houses in that region because they would not be compensated for them. Since then, these people live in total uncertainty and can no longer make any long-term plans, at the risk of losing their assets when they start construction. ProSavana, on the other hand, has been characterized by the secrecy, manipulation and misrepresentation of information with the aim of promoting a false idea that the project will promote agricultural development in the northern region of the country, while in fact it is an initiative that will serve to facilitate large scale encroachment of peasant lands. This program will also destroy the livelihoods of local populations and exacerbate their already grave poverty. There are already reports of manipulation and intimidation of leaders of local peasant organizations.

The mobilization of civil society (Mozambican, Japanese and Brazilian) in opposition to ProSavana was fundamental to halt to the initial plans of this program and postpone the conclusion of its Master Plan. The purpose of taking these two cases to the PPT is to bring together even more elements that may help stop these projects.

Spaces such as the PPT are also crucial for perceiving trends, identifying development models, and analyzing common practices of transnational corporations – as well as their strategies to escape responsibility. Thus, by moving these experiences to a more global scale, it is easy to see that these violations of fundamental human rights are not perpetrated by one or another transnational corporation in isolation. That is, these are not a couple of rotten apples in a sack full of beautiful apples. Rather, it is a generalized behavior that is enabled by an architecture of impunity, characteristic of our extractive capitalist development system. This architecture of impunity puts corporate rights above human rights, and makes way for an abundant number of examples of very lucrative corporate crimes.

The architecture of impunity consists of several elements and actors:

We have the economic power of corporations – on the basis of which these establish their relations with one another and with states – and of international financial institutions;

We have political power, which in turn is responsible for capturing policies and politicians that fail to regulate the collective interests of society to serve private interests;

Trade architecture, embodied by numerous trade and investment agreements, facilitates profit and allows corporations to file lawsuits against governments should they make decisions that affect their anticipated profits;

Legal power is represented by the financial capacity to hire and dispose of influential lawyers who defend corporations in endless processes, as well as by inadequate and insufficient legal instruments that regulate their actions; and finally

Social power, which is exercised in all spheres of our lives through the influence that corporations have in the media, academic spaces, civil society organizations, among others.

Discussing some of these elements and developing the cases that will be presented in the PPT next month, were the objectives that motivated the Workshop on the Architecture of Impunity, held in the context of the Southern Africa Campaign to Dismantle Corporate Power. Since it is the affected communities themselves who present the cases to the Panel of Jurors in the PPT, this enabled them to get the support of several resource people, to appeal, discuss and deepen the specificities of their denunciations and also to identify common ground with the other cases.

But the struggle to end corporate impunity is not only fought in the field of opinion sentences, nor is the important opinion of a panel of judges our only weapon to demand a different behavior from transnational corporations. Another battle is being waged to develop a legal instrument that will ultimately have the power to condemn and punish corporations – since the absence of such an instrument is currently one of the biggest gaps in international law. We are talking about the UN Intergovernmental Working Group, created in 2014 with the mandate to develop a binding treaty for transnational corporations on human rights issues, which will meet in October this year for its third session. At this time, transnational corporations simply have to follow voluntary standards and guiding principles that “advise” best practices on human rights issues. There is no doubt that this blind faith in corporate goodwill has had grave and irreparable consequences, both on people and on the planet. In next month’s article, we will look into this issue more carefully, getting deeper into the debate about the urgency of a legal mechanism that is accessible to any community affected by the operations of a transnational corporation. For now, we continue to look closely at next month’s PPT, certain that this will be another important moment regarding the convergence of struggles for a fairer, healthier and more common-good oriented world.

Tagged , , , , , , , , , , , , , , , , , , , , , , ,

Supports who?

Another mega agricultural project launched in Mozambique

We received the news about its launching ceremony with skepticism. For many of us, it was the first time we were hearing about the project. Another mega project loaded with ambitious and (some) noble goals, like so many others that preceded it and vanquished without achieving half of what they set out to do.

“This mega project of my Government, whose objective is to gradually take rural families out of poverty, is the embodiment of the investment in Mozambican families as the main mechanism to promote sustainable, integrated and inclusive development and reduce regional and local asymmetries”, said Filipe Nyusi.

It is premature to make major considerations or comments on the subject because still very little is known. We have not yet had access to any document on the project, and the little information that exists is circulating in the mainstream media. However, the simple fact that a project this big (judging by the amounts involved and by the 125 thousand families of alleged beneficiaries) is launched in this manner, leads us to ask: Where did this project come from?

Once again, this is a top to bottom approach. The project was designed, discussed and launched, without giving the alleged beneficiaries or other interested parties and/or affected people, the chance to participate in its construction!

Surely there are more than enough reasons to justify the urgency to launch this project. To justify why there was no time to perform appropriate public consultations; to involve the many actors who deal with agricultural issues such as research institutions, academics, civil society, grassroots organizations and peasants in discussions on priorities for the development of peasant agriculture; and to design the project on the basis of a truly open and transparent process.

To justify their hurry, the noblest of reasons will be invoked, such as the urgent need to support the development of the peasantry, given their evident poverty and vulnerability. Obviously, old and less noble arguments – which, truth be said, are nothing but mere distractions – will also come back, like accusing those who question the project of being against development and/or unpatriotic.

Interestingly enough, the World Bank and other similar agencies are far more influential in deciding what may or may not happen in Mozambique than the Mozambican people. And although, as we have said earlier, we know nothing about this project yet, we risk guessing that the role of the World Bank is not limited to financing it. They have certainly been involved in the project’s conception, ensuring that their altruistic support goes mainly to what interests them most: agro-business and forest plantations – monocultures of exotic species – they call reforestation.

“More than 5,000 jobs will be created by forest plantations, through the reforestation of more than 1600 hectares of degraded lands.”

According to information in the media, this project was conceived by MITADER and will be supported by the World Bank! The perfect wedding!

In other words, we owe a great debt to our government (and no, it is not that hidden and illegal debt we talking about)! We are deeply grateful to them for granting us another ready-made project to reduce poverty. Free from burdens such as having to think about development issues, about inclusive and participatory strategies, about how to ensure that the priorities of the peasantry are properly included, and even about how we want to manage our resources and how we want to see our country in the coming years.

For now, let’s wait for the enthusiasm to fade so we can then try to understand how this mega project is supposed to work and, above all, how will it – unlike the many others in the past just like it (loaded with the same promises and the same rivers of money to implement) – finally get Mozambicans out of poverty?

Who has left poverty behind thanks to the fantastic green revolution? Who has left poverty behind growing jatropha or other biofuels? Who will benefit from Prosavana? Someone always profits, but who? And at what cost? How many hundreds of thousands of Mozambicans’ well being will these ready made projects with incognito beneficiaries “cost”?

And while misunderstandings and failures in communication are, unfortunately, too often invoked to justify civil society’s opposition to so many mega-projects, – even though they are never the main reason – people insist on doing things behind closed curtains. Where is the official information about the project? It has already been inaugurated; it is already being advertised in the media; but it is not available on the websites of the entities involved and all we know about it is what is being reported by the media.

We would also like to believe and share their enthusiasm, but skepticism has taken over us long ago. Now we prefer a “seeing is believing” approach, and we have not seen anything yet …

 

Tagged , , , , , , ,

March for Human Rights

IMGP9596 On Monday this week, JA staff and board again took to the streets of Maputo. After the historic and fun march in Maputo back in August, where we were joined by human rights and environmental organisations from all across southern Africa, this week Mozambican organisations continued to march to assert their rights.

The occasion was 10th of December, the International Day for Human Rights. The march to commemorate this day was organised by Liga dos Direitos Humanos (Human Rights League) in Mozambique in partnership with Justiça Ambiental, National Forum of Community Radios, and others.

The marchers gathered at 9am at the Independence Square in Maputo City, and marched up Karl Marx Avenue and thenIMGP9617 up 24th of July Avenue. The marchers were a small but vocal group. We chanted non-stop, filling the streets with loud and animated slogans in Portuguese:

  • “Respect Human Rights”,
  • “What do we want? – Human Rights!! When do we want it? – Now!
  • Viva freedom! – Viva! Viva right to information! Viva!
  • Life is not for sale, life is to be defended!
  • The Right to Health – is Ours! The Right to Education – is Ours! The Right to Land – is Ours! The Right to Information – is Ours! The Right to security – is Ours! The Right to demonstrate – is Ours!
  • Down with those who commit violence – Down!
  • Down with those who violate human rights – Down!

 

IMGP9924When the marchers were a block away from the Parliament building/ National Assembly, we suddenly came face-to-face with a roadblock. We had asked for and received permission to hold the march on that route, and to deliver a petition to the Parliament on human rights situation in Mozambique. Yet, it was obvious that the government of Mozambique had a different idea. We were greeted with great pomp and show by the Rapid Intervention Force. It must be remembered that, just a few months ago, it was the members of this same Rapid Intervention Force that fired on communities protesting displacement and dispossession due to Vale’s coal mining operations in Tete province, central Mozambique.

The Rapid Intervention Force stood in our path, blocking the march route. They blocked the road and even had a massive armored tank in the middle of Maputo city! Every once in a while, the soldiers from inside the tank would peer out and look at us; their weapons drawn. Please see the photos.

The police on the streets were far less subtle. They were fully dressed in riot gear, even though we were less than 70 marchers holding only a peaceful protest on a pre-approved march route chanting for peace and human rights! Yet, the police were armed with tear gas guns, rubber bullets, pistol and who knows what else. We were barred passage to even the entrance door of the building of the Parliament, and after a long wait we were only allowed to send four of our representatives to deliver the declaration. The declaration urged the government to respect human rights.IMGP9846

There is no reasonable explanation for the reaction of the government and the police. Only one explanation makes sense. It was an intimidation tactic. Civil society in Mozambique is small but is getting more and more vocal. The communities are raising their voices against oppression, and this is threatening the state’s plans for more greed and unsustainable development. But we have one message to send to the state: We will not be silenced. We will continue to speak out against injustice.

 

Come join us!

 

Tagged ,

Notes from the Field: Vale-displaced communities in Cateme

Almost 200 people filled a room at the Escola Secundária Cateme (Secondary School of Cateme) on2 foto_meeting_8octblog_photo credit Gregor Zielke Saturday, 6 October. Cateme is the region where communities displaced by Vale coal-mining in Tete province, Mozambique, have been resettled. Women, men, children, babies, the elderly, students and teachers from the communities came together this past Saturday to speak out about the problems they are facing in resettlement.

Saturday’s meeting at the Secondary School was convened by Liga dos Direitos Humanos (Human Rights League), UNAC (National Farmers Union), AAAJC (Association for Support and Legal Assistance for Communities) and Justiça Ambiental. The land law and Mozambican constitution were presented for people to understand their rights, and copies of these booklets were given to various community representatives. Following the presentations, community members spoke vociferously one after another, explaining the problems they were facing.

Vale is the second-largest mining company in the world, with revenues exceeding US$ 45 billion and profits around US$ 17 billion. But Vale is also a global leader in its devastating disregard for human rights and 3 foto_cateme_8octblog_photo credit Gregor Zielkeenvironment protections. There is even a global movement around the world called “Affected by Vale”, bringing together communities that are the victims of Vale’s greed. Every time Vale enters a new country or region, the “Affected by Vale” movement ends up with new members. Mozambique is no exception.

In Mozambique, Vale is mining coal at an open-cast coal mine in Moatize, Tete province. The communities living in the area were relocated to Cateme. Every time we visit Cateme and stand in the middle of the village, we understand why Vale is considered the worst company in the world. The area is dry, hot and desolate. The land produces dust instead of crops and the 40°C plus temperatures, including in this past week, turn the small zinc-roofed houses where people have been resettled into over-sized ovens, with inside temperatures exceeding 50°C! The few times it does rain, the roofs leak and even though most houses are only a few years old, they are already cracking.

Life has always been hard in Tete province in inland Mozambique, but people developed survival methods. The community relocated to Cateme because of Vale’s mining had productive lands. They were close to heath posts, schools, churches, friends, family and one of the largest markets in the province where they could sell their crops. Now they are 37 kms away from their main market of Moatize. People said they spent up to 100 Meticais (US$4) per day getting to and from Moatize.

1 foto_meeting_8oct blog_ photo credit Mauro PintoEven the secondary school where the meeting was held was supposedly for the resettled communities. Yet we discovered that out of 150 students, a paltry 20 come from resettled communities, the others are from wealthier families in Tete, Moatize, etc.

The people tried to discuss the issues with Vale and the government, and when that failed, they stood up and demanded to be heard. Earlier this year they held a peaceful protest and occupied the road and railway to make Vale take their concerns seriously. The reaction from the Mozambican government, backed by Vale, was unmitigated violence by the rapid intervention police, who used live ammunition, and shot rubber bullets directly at unarmed peaceful protesters, sending 6 to the hospital and 14 to jail. One man’s horrendous injuries were photographed in January. We photographed him again and his injuries persist almost 9 months later.

Photo Credits (from the top down):

Photos 1 & 2:  Gregor Zielke

Photo 3: Mauro Pinto

Tagged , , , , , , , , , ,